American Electric Glen Lyn Pond



Glen Lyn, VA

Project Manager(s)
Lindsay Weiford

Services Provided
Geotechnical Engineering
Construction Materials Testing

Completion Date

Draper Aden Associates provided Construction Quality Assurance for a 12-acre closure for a fly ash holding basin involving preparation of subgrade soils, installation of 30-mil PVC liner -Geocomposite, and placement of protective cover soils. The project also included very sensitive erosion and sediment control measures due to the proximity of the new river and the fly ash. Additional services included surveying and final closure plat.


  • deploying PVC liner panel #1
  • deploying liner eastern portion
  • staging PVC liner
  • test strip compaction